Mark E. Baker, P.E., P.S.
 
 
 
 
 
 
 
 
 
 
 
 
 
Projects/Closures
 
CRA-TR 163-0.38 (Hosford Road)
Bridge Replacement
 
Replacement of an existing deficient bridge on TR-163 (Hosford Road) over the Olentangy River in Polk Township.
 
Estimated project performance timeframe:  Spring/Summer 2021
 
Work to be performed by:  Contractor (to be determined)